Ensuring safe, reliable, and efficient start-up of energy projects.
MCCS International’s commissioning specialists bring over 30 years of global experience from complex energy commissioning projects, international offshore commissioning projects, onshore projects, FPSOs, refineries, petrochemical plants, liquified natural gas terminals and large industrial facilities.
Commissioning is the final phase before a facility starts production. It involves energisation and actual process introduction to ensure equipment and systems operate according to design.
Systems Energisation
Critical utility systems are powered on ahead of testing, following strict permit-to-work lockout/tagout, and safety procedures. Tested systems include:
Electrical substations like, transformers, MCCs, and switchgears
Service, instrument, air, nitrogen, diesel, HVAC systems
DCS, ESD, FGS, and PLC control systems
Functional Testing of Equipment
Every piece of equipment must operate under controlled conditions to confirm equipment readiness before final start-up. MCCS performs:
Motors, solo runs
Pump and compressor mechanical run tests
Heater, boiler, and burner functional tests
Valve stroke tests
Turbines pre-start checks
Safety system verifications
Loop Testing & Communication Verification
Plant commissioning requires full integration between field instruments and control systems, such as:
Final loop checks from instruments to DCS
Alarm and trip logic testing
Shutdown sequences
Interlock validation
ESD/FGS functionality testing
These systems ensure accurate control, monitoring, and emergency response capability.
Process System Commissioning
Once utilities and safety systems are proven, MCCS commissions process systems like:
Flare system readiness
Process gas/hydrocarbon introduction
Chemical injection start-up
Line-up and isolation checks
Equipment operation readiness
These ensure that each process unit operates within design parameters.
Safety & Protective Systems Commissioning
The following safety systems are thoroughly validated to ensure personnel and asset protection during operations:
Fire & Gas System testing
Deluge and sprinkler activation tests
Emergency shutdown ESD logic execution
Blowdown system operation
Pressure relief device validation
Emergency lighting & escape route checks
Dynamic Testing
Previous tests to this stage are simulated without oil and gas. The following systems need to be proven to run in real operating conditions:
Flow tests
Pressure control stability
Temperature control response
Separator performance testing
Compressor/ turbine performance testing
Pump NPSH & flow curve checks
Optimisation & Troubleshooting
Few oil and gas, LNG, and energy plants start operating perfectly on the first try. Commissioning tests will often reveal gaps that require targeted fine-tuning to meet the design intent. MCCS delivers:
Control loop tuning to stabilise operations
Process optimisation to achieve design performance.
Equipment vibration analysis for early fault detection.
Performance data logging for operational validation
Vendor coordination for specialist equipment for equipment-specific issues.
Punch List Closure
The last stage of commissioning before the certificates can be issued is the closing of all remaining B and C punch items, including:
Final vendor punch lists
Control room action lists
Documentation, Certification & Handover
Once all tests are complete, MCCS hands over full commissioning documentation and certificates. These are:
Functional test reports
Loop check results
Equipment start-up reports
As-built P&ID
Commissioning dossiers
Operations handover package
Ready For Start-Up (RFSU) Certificate
Operations Training & Briefing
Final Punch list closure
The facility is now fully operational and ready for production.
Choose MCCS As Your Plant Commissioning Vendor
With over 30 years of international offshore commissioning experience, MCCS are well-positioned to energise your oil and gas project.